Projects

WhatsApp Image 2025-10-07 at 3.31.50 PM

6090-EPC-MPQ & DSO Harbour
Liberia

● Owner / Employer: ArcelorMittal Liberia Ltd
● PMC / AMC: DMRC
● Main Contractor: Afcons Infrastructure Ltd.
● Scope of Work: Offshore activities including underwater seabed surveys, marine craft support and rescue operations
WhatsApp Image 2025-10-07 at 3.37.44 PM

Khandwa Intake Well Charkheda Pump House, Madhya Pradesh

● Owner / Employer: Narmada Water Scheme
● PMC / AMC: Mehta Consultant
● Main Contractor: CMR Infrastructure Pvt. Ltd.
● Scope of Work: Underwater core cutting in intake well: 3 nos., approx. 1000 mm dia (or square) in 500 mm thick concrete wall
WhatsApp Image 2025-10-07 at 3.39.34 PM

EPCI of Second Liquid Cargo Berth at GCPL, Dahej, Gujarat.

● Owner / Employer: Gujarat Chemical Port Limited (GCPL)
● PMC / AMC: RPMG
● Main Contractor: Afcons Infrastructure Ltd.
● Scope of Work:Carry out all underwater works instructed by the contractor for the project
vsvsvs

Mumbai Coastal Road Project PKG-2 Worli, Mumbai

● Client: BMC / MCGM
● Consultant: AECOM
● Main Contractor: HCC – HDC JV
● Subcontractor: International Divers Aquarium
● Scope: Underwater mooring pile cutting (1m, 2m & 3m dia)
● Duration: Jan 2024 – Feb 2025
● Outcome: Work completed successfully
hasaa

IOCL Captive Jetty Project Kamarajar Port Ltd. Chennai

● Client: Indian Oil Corporation Ltd (IOCL)
● Consultant: TEPL
● Main Contractor: ITD Cementation India Ltd
● Scope: Underwater diamond wire saw cutting of RCC piles for IOCL captive POL/LPG marine jetty & associated facilities
● Duration: Oct 2023 – Jul 2025
● Outcome: Work completed successfully
Untitled (1160 x 828 px) (1160 x 782 px) (1160 x 774 px) (1160 x 870 px) (1160 x 764 px) (1160 x 774 px) (1160 x 870 px)

Underwater Diaphragm Wall Repair at Berth 3, Kakinada SeaPort

● Client: Kakinada Seaport Ltd
● Consultant: L&T Infrastructure Engineering Ltd
● Main Contractor: International Divers Aquarium
● Scope: Underwater repair of concrete diaphragm wall between Bollards 23 & 24 at Berth 3, Kakinada Port
● Duration: Oct 2020 – Mar 2021
● Outcome: Work quality found satisfactory
bgbgb

Greater Male’ Connectivity – Male’ to Thilafushi Link Project, Maldives

● Client: Maldives Ministry of National Planning
● Consultant: Arup Ltd
● Contractor: Afcons Infra Ltd
● Scope: Silt screen, geotextile & rock works
● Duration: Jun–Dec 2022
● Outcome: Completed successfully
Untitled (1160 x 828 px) (1160 x 782 px) (1160 x 774 px) (1160 x 870 px) (1160 x 764 px) (1160 x 774 px) (1160 x 870 px)

100 MLD SWRO Desalination plant, Dahej, Gujarat

● Client: GIDC
● Contractor: L&T–Tecton JV
● Scope: Underwater liner cutting & concrete breaking
● Duration: Feb–Apr 2022
● Outcome: Work completed satisfactorily
bgbgbg

Nouakchott Container Terminal on EPC basis at Nouakchott

● Client: ARISE Mauritania SA
● Consultant: EGIS Intl
● Contractor: Afcons Infra Ltd, Mauritania
● Scope: Supply of divers for Nouakchott Terminal
● Duration: Dec 2019 – Oct 2020
● Outcome: Completed successfully
Untitled (1160 x 828 px) (1160 x 782 px) (1160 x 774 px) (1160 x 870 px) (1160 x 764 px) (1160 x 774 px) (1160 x 870 px)

Underwater Beam Repairing and Groove Maintenance

● Client: Rasuwagadhi Hydropower Co. Ltd (RGHPCL)
● Contractor: Civil Index Construction Pvt. Ltd
● Scope: Underwater beam repair & groove maintenance
● Duration: Oct 2019 – Jan 2020
● Outcome: Completed successfully
Untitled (1160 x 828 px) (1160 x 782 px) (1160 x 774 px) (1160 x 870 px) (1160 x 764 px) (1160 x 774 px) (1160 x 870 px)

Hydro Power Plant
Maintenance

● Client: Kalpan Hydro Company Pvt. Ltd
● Contractor: Gill Acqua Hydro Power Generation Co. Pvt. Ltd
● Scope: Underwater videography, photography, inspection & gate sealing
● Duration: Feb–Mar 2019
● Outcome: Work completed satisfactorily
WhatsApp Image 2025-10-04 at 12.40.12 PM

Construction Of Greenfield Port at Ramayapatnam on Engineering

● Client: Andhra Pradesh Maritime Board
● Consultant: NECL–ARIPL JV
● Contractor: Auro Infra Pvt. Ltd
● Subcontractor: International Divers Aquarium
● Scope: X-Bloc placing & underwater videography
● Duration: Oct 2023 – Oct 2024
● Outcome: Completed successfully
Untitled (1160 x 828 px) (1160 x 782 px) (1160 x 774 px) (1160 x 870 px) (1160 x 764 px) (1160 x 774 px) (1160 x 870 px)

Corrosion Protection to Quay Structures at Port Louis Harbour

● Client: Mauritius Ports Authority
● Contractor: Del Seatek India Pvt. Ltd
● Scope: Supply & installation of aluminum anodes with brackets, marine growth removal, and surface prep at Quays 1–4, A, D, E, Trou Fanfaron & Port Mathurin
● Duration: Sep 2018 – Mar 2019
● Outcome: Work completed successfully
Untitled (1160 x 828 px) (1160 x 782 px) (1160 x 774 px) (1160 x 870 px) (1160 x 764 px) (1160 x 774 px) (1160 x 870 px)

Channel Cutting work for NTPC LTD, Super Thermal Power Rihandnagar

● Client: NTPC Limited
● Contractor: Paharpur Cooling Towers Ltd
● Scope: Diamond wire cutting of channel wall for modification & installation of cooling towers
● Duration: March 2019 Executed within schedule with strict adherence to safety and quality standards.
● Outcome: Work completed successfully
Untitled (1160 x 828 px) (1160 x 782 px) (1160 x 774 px) (1160 x 870 px) (1160 x 764 px) (1160 x 774 px) (1160 x 870 px)

Kudankulam Nuclear Power Project Units – 3&4 Tirunelveli, Tamilnadu

● Client: Nuclear Power Corporation of India Ltd (NPCIL)
● Consultant: AECOM
● Contractor: Sanjay Construction Company
● Scope: Underwater block placing, drilling & blasting works
● Duration: Dec 2018 – Oct 2019
● Outcome: Work completed successfully
Untitled (1160 x 828 px) (1160 x 782 px) (1160 x 774 px) (1160 x 870 px) (1160 x 764 px) (1160 x 774 px) (1160 x 870 px)

Construction of Coal Berth no 3 & 4 KPL

● Client: Kamarajar Port Ltd
● Consultant: Howe (India) Pvt. Ltd
● Contractor: Afcons Infrastructure Ltd
● Scope: Dry & underwater diaphragm wall repair (450m × 25m) and geotextile layer
placement for slope protection
● Duration: Feb 2017 – Dec 2018
● Outcome: Work completed successfully
Untitled (1160 x 828 px) (1160 x 782 px) (1160 x 774 px) (1160 x 870 px) (1160 x 764 px) (1160 x 774 px) (1160 x 870 px)

Construction of Oil jetty Project Liberia

● Client: Arcelor Mittal Liberia Ltd
● Consultant: Royal Haskoning DHV
● Contractor: Afcons Infrastructure Ltd
● Scope: Underwater survey, sheet pile cutting (100m), welding (150m), steel fit-ups (10 MT) & sheet pile installation (50 MT)
● Duration: Jan – Jun 2013
● Outcome: Work completed successfully

INQUIRE NOW

Call Now Button